Apogee Utility CDM Risk Assessment

The requirements of the new CDM Regulations published in 2015 moved the responsibility for the pre-contract H&S pack from the Main Contractor to the Client or his Principle Designer.

Apogee draws on decades of experience of assessing the Health & Safety risk of conflict with utility plant offering this comprehensive report. Our experts take the utility plant search results compare them with the client’ s scheme drawings and deliver a full analysis of risk and a set of recommended actions to minimize on site Health & safety risk. This enables the client to determine what courses of action are required to ensure HSG47, PAS 128 and CDM regulation compliance.

Our report delivers a Risk Classification, ALARP assessment, severity and likelihood designations. The result is a report that takes the client through the process in accordance with HSG47 and PAS 128 enabling competitive tendering for further site investigations either before or after the pre contract Health & Safety pack.

A Fixed Fee approach and a report delivered in unlocked pdf with a useful summary page and table of risks.

 

Suitable for:

Solicitors, Clients, Designers and Project Managers.

Developers, Local Authorities Consultants, Architects, Design & Build Contractors, Contractors, Highways scheme promoters, Surveyors and Health & Safety consultants

Fees from

£400 + Vat

£2 Million PI Insurance

Covers requirements of CDM file and pack

Most Comprehensive and cost effective search in the market guaranteed

Delivered in user friendly pdf report

All site sizes and shapes, standard site size up to 25 Ha

Speed of Service available 25 days

RAG risk severity rating for easy interpretation

Action Recommendations, HSG 47 and PAS 128 commentary