Land East of Culford Road – Residential

Case Study:
Apogee Utility Consultancy Reports - Land East of Culford Road - Residential

Home » Land East of Culford Road – Residential

What was the Client Requirement?

Transport Planning Associates (TPA) needed utility information to inform their own client on a potential residential development in Bury St Edmunds. The end client on the project did not have much time to finish the pre-planning stage due to tight timeframes and so Apogee were asked to provide the plans as soon as possible and earlier than the typical delivery date. In addition to this, the client needed a layered PDF Fastview report to use with their design work alongside and after the application.

What was the Apogee Solution?

Using their experience in analysing utility plans and knowledge of how to handle them in relation to new developments, Apogee was to collect all existing utility plans and make them available individually, with many plans available to the client within hours of ordering the report. Providing plans individually and before the report is delivered as a whole is available to all of our clients as time is often of the essence when it comes to making design decisions on developments and understanding feasibility. Compliance is only one part of the process in utility consultancy and Apogee specialise in assisting works in general beyond having compliant data to work with.

What was the result of the report?

The Utility Search for this site was busy for a seemingly empty area, with 10 separate utilities affecting the potential of the Development. The main utilities – Power, Gas, Water, Sewerage and BT were all present, with multiple gas operators owning pipes in and around the area. There were also some strategically important oil pipelines across the site including an Exolum Pipeline originally constructed to supply airfields during World War II. Obviously, these assets present a unique and challenging utility situation for development and knowledge of their location is a practical and legal necessity for developers.

Why was the client delighted?

Apogee was able to deliver the report in full before its typical delivery date in this case, as we are often able to do when the client is facing unique time pressures and/or requests it. The Report was delivered 100% complete, and the Fastview accompanying the search was delivered on time and including all affected assets for the site. Both reports included the full extent of the proposed residential development and the extents of the surrounding roadways, including an A road and several more minor roads.

View our range of Consultancy Services from this page – click here to view more.

Who else would buy this?

Our consultancy reports are ideal for Solicitors, Clients and Project Managers, Developers, Local Authorities Consultants, Architects, Design & Build Contractors, Highways Scheme promoters and Surveyors. Anyone involved with a residential or commercial development who would benefit from understanding the risks and costs which come from utilities would be well placed to talk to us. Even if you are not the source of funds for the development and costs savings are of secondary importance to you, we can help you avoid other inconveniences such as delays and reduce the risk of any accidents or strikes of existing plant, as well as improve due diligence and help you achieve compliance under the relevant guidelines and regulations, namely PAS128 and HSG47. We have decades of experience in managing such conflicts across our capable team, a member of whom was on the PAS128 steering committee and who was personally involved in the drafting of PAS128 Quality Level D.

View our case study on Barbers Product Search – click here to open in a new window

Share with:
Latest Case Studies:
Great Houghton SPS

Apogee upgraded Newbiggin Wastewater Treatment Works to handle higher water volumes, enhancing Morecambe Bay’s water quality. The timely, detailed utility report pleased the client by addressing potential utility conflicts.

Dorchester Fish Pass Weir Removal

Apogee upgraded Newbiggin Wastewater Treatment Works to handle higher water volumes, enhancing Morecambe Bay’s water quality. The timely, detailed utility report pleased the client by addressing potential utility conflicts.

Land East of Culford Road – Residential

Apogee upgraded Newbiggin Wastewater Treatment Works to handle higher water volumes, enhancing Morecambe Bay’s water quality. The timely, detailed utility report pleased the client by addressing potential utility conflicts.

Newbiggin Wastewater Treatment Works – Morecambe Bay

Apogee upgraded Newbiggin Wastewater Treatment Works to handle higher water volumes, enhancing Morecambe Bay’s water quality. The timely, detailed utility report pleased the client by addressing potential utility conflicts.

Mixed Green Energy Management Scheme – Education

The client required a net zero carbon energy strategy for a college, including solar panels and boreholes. Apogee provided a comprehensive utility conflict report, ensuring clarity and safety, delighting the client.

Post Sections: