What was the Client Requirement?

Apogee were instructed by Morris Property to provide a full utility turnkey full development life cycle consultancy service for a prestigious new industrial estate in Ketley, Telford. The site required a Full Utility Search in compliance with PAS128 & HSG47 as well as a Site Investigation and Management of the development’s connections and any relevant diversions, disconnections. The site is the former location of a print works and had several unique challenges related to its existing utilities and the legal situation in regard to the site.

 

What was the Apogee Solution?

Apogee provided their full range of utility consultancy services to provide and manage the utility conflicts and their solutions for this project; Along with the usual Utility Search a full CDM Risk Assessment and site investigation, management of new connections and diversions, and a POC and point of capacity check – in short, Apogee managed all utility remediation for the development throughout the planning and design stages and well into construction. We negotiated with and developed the utility proposals with the relevant utility operators, handling disconnections and cutbacks. Disconnections and new connections for water, power and telecoms infrastructure were needed. Additionally, all protection and diversion works were minimised as far as possible, and the best points of connection were identified.

 

What was the result of the report?

The site was a complex one with several utilities to be managed together with an adjacent industrial site the client also sought to develop, which added further complexity. The presence of a private road to the South of the site prevented its use in the new connections and alternative routes had to be found. Key to this was the issue of ensuring each site had its own access from the North so future utility maintenance or modifications could be undertaken without disruption to the other development, and to minimise traffic management costs which were more of an issue for the Waterloo Road on the Eastern side of the site. Naturally, some of the Apogee team got out on site to inspect the features and assets themselves as part of their work!

 

Why was the client delighted?

The results of the site investigation for this development were positive overall, while there were a lot of factors and complexities to consider, there was nothing preventing the development – capacity to supply the site existed for the main utilities and telecoms networks and nearby points of connection were available. There were no additional diversion costs incurred by the development and there was no need to manage any reinforcement works. There were multiple options for connecting telecoms to the site and so a resilient backup connection (both FTTP and EAD) were able to be identified without much trouble as well.

View our range of Utility Consultancy Services and Reports from this page – click here to view more.

 

About the client:

Morris Property is a forward-thinking property company spanning development, construction and portfolio management. A highly collaborative partner in realising any development vision, Morris are based in Shrewsbury and have a reputation built over 100 years in commercial and residential property, development and investment. Proud to be a part of a fifth generation family business group, Morris have a wide portfolio of over 200 developments across Shropshire and adjacent counties, and are one of the area’s most established and entrusted institutions.

 

About the client:

James West, COO of Morris, says: “We have been impressed by Apogee’s understanding of utility processes, and it is clear to understand how their methodologies are going to bring value to our development life cycle. They are off to a great start and we look forward to developing the relationship into the future.”

Who else would buy this?

Our full turnkey consultancy services are ideal for  Clients and Project Managers, Developers, Local Authorities Consultants, Architects, Design & Build Contractors, Highways Scheme promoters and Surveyors. Anyone involved with a residential or commercial development who would benefit from understanding the risks and costs which come from utilities would be well placed to talk to us. Even if you are not the source of funds for the development and costs savings are of secondary importance to you, we can help you avoid other inconveniences such as delays, and reduce the risk of any accidents or strikes of existing plant, as well as improve due diligence and help you achieve compliance under the relevant guidelines and regulations, namely PAS128 and HSG47. We have decades of experience in managing such conflicts across our capable team, a member of whom was on the PAS128 steering committee and who was personally involved in the drafting of PAS128 Quality Level D.

View our case study on Barbers Product Search – link to follow

Share with:
Latest Case Studies:
Land East of Culford Road – Residential

Transport Planning Associates (TPA) needed utility information to inform their own client on a potential residential development in Bury St Edmunds. The end client on the project did not have much time to finish the pre-planning stage due to tight timeframes and so Apogee were asked to provide the plans…

Newbiggin Wastewater Treatment Works – Morecambe Bay

Sewer Treatment upgrades have become a focus of national attention in recent years, with discharge rates being a regular item in media headlines. Climate change is also influencing the country’s weather, with rainfall becoming increasingly unpredictable and intense. Due to these factors, there are many upgrades being commissioned for water…

Mixed Green Energy Management Scheme – Education

The client in this case was a college developing its site energy strategy and moving to a full net zero carbon energy use profile. This included 2500m2 of roof installed solar panels as well as a 220 Ground Source Borehole field and new multipurpose Energy Centre. The client commissioned in…

Land at Heywood Road, Diss, Norfolk

Minster Property sought clarity on a proposed development of 179 residential units on Heywood Road in Diss, Norfolk. Apogee were instructed to help investigate the options and feasibility for the development especially in regards to the ease of new utility connections for the properties to receive Water, Power and Heating.

Rother Valley Railway

There are more than 150 Heritage Railways in service across Britain, covering 560 miles of track between 460 Stations, according to the Heritage Railway Association – most of these railways operate classic steam locomotives, and together, they preserve the history of British Rail transport and one of the country’s largest…