Douglas West Windfarm

Case Study:
Douglas West Windfarm - Apogee Utility Consultants - Apogee Full Utility Search Report
Home » Douglas West Windfarm

What was the Client Requirement?

To deliver on the UK Government’s Net-Zero targets, Scotland has seen an intense focus on renewable energy in recent years with the majority of this being wind power, which is the fastest-growing renewable technology in Scotland. As part of this ambitious project, Apogee was instructed to perform a Utility Search of two large sites near Douglas West Wind Farm (one of several such sites Apogee have undertaken) to identify any utility risks or challenges which could impact the development. Wind farm extensions and new builds typically involve very large search areas and often involve highly important electrical connections, so present a unique challenge when collating and analysing utility information.

What was the Apogee Solution?

Apogee provided the client with a Full Utility Report detailing the site’s utility situation, with two main affected utilities highlighted as relevant to the site. Wind Farms by their nature are constructed in rural areas with less utility density than for an urban site, however, the large area covered (In this case many tens of square kilometres in total) necessitated collecting hundreds of pages of plans for various utilities, and a thorough visual check for quality assurance of each. This site also included very large access roads due to its remote location, which further increased the number of plans required.

What was the result of the report?

The report found that there were main utilities within the site area, as well as multiple telecoms assets. Scottish water mains and Scottish Power HV Cables crossed the site at multiple locations (Both supplying the wind farm and transmitting to other parts of Scotland) and Telecoms assets were identified from BT and Zayo, as well as wireless masts. In addition to these, the site was found to be within the Coal Authority’s marked areas – specifically above a Coalfield.

Why was the client delighted?

The Reports were delivered on time and without any delays and provided the client with exactly the data they wanted in formats which were easy for them to use. For larger sites like this, the Apogee team often have to split the Reports into multiple PDFs because of the file size limits and the loading speeds of the data. Apogee’s delivery method using Microsoft SharePoint was very effective for this project, as it handled the large document sizes and the complex file structures well.

View our Full Utility Search Report Service – click here to view more.

Who else would buy this?

Any large-scale scheme promoters. Those developing wind farms or solar farms as well as battery storage sites or any other large-scale infrastructure developer. Apogee’s search reports and Fastview combined drawings are ideal for Solicitors, Clients and Project Managers, Developers, Local Authorities Consultants, Architects, Design & Build Contractors, Highways Scheme promoters and Surveyors. Anyone involved with a residential or commercial development who would benefit from understanding the risks and costs which come from utilities would be well placed to talk to us.

Even if you are not the source of funds for the development and cost savings are of secondary importance to you, Apogee can help you avoid other inconveniences such as delays and reduce the risk of any accidents or strikes of existing plant, as well as improve due diligence and help you achieve compliance under the relevant guidelines and regulations, namely PAS128 and HSG47. Apogee has decades of experience in managing such conflicts across their capable team, a member of whom was on the PAS128 steering committee and who was personally involved in the drafting of PAS128 Quality Level D.


View our Case Study on the Barbour Product Search website – Click Here to view it in a new window.

Share with:
Latest Case Studies:
Mixed Green Energy Management Scheme – Education

The client in this case was a college developing its site energy strategy and moving to a full net zero carbon energy use profile. This included 2500m2 of roof installed solar panels as well as a 220 Ground Source Borehole field and new multipurpose Energy Centre. The client commissioned in…

Land at Heywood Road, Diss, Norfolk

Minster Property sought clarity on a proposed development of 179 residential units on Heywood Road in Diss, Norfolk. Apogee were instructed to help investigate the options and feasibility for the development especially in regards to the ease of new utility connections for the properties to receive Water, Power and Heating.

Rother Valley Railway

There are more than 150 Heritage Railways in service across Britain, covering 560 miles of track between 460 Stations, according to the Heritage Railway Association – most of these railways operate classic steam locomotives, and together, they preserve the history of British Rail transport and one of the country’s largest…

The Arc Fastview

The Client sought utility information for a pedestrianisation project in Westminster, located just South of St James Park and only a short walk from Buckingham Palace. In addition to Apogee’s QL-D Compliant Search Report, a Fastview layered utility plan in .pdf, .dwg and .shp was also provided. Central London is…

Douglas West Windfarm

To deliver on the UK Government’s Net-Zero targets, Scotland has seen an intense focus on renewable energy in recent years with the majority of this being wind power, which is the fastest-growing renewable technology in Scotland. As part of this ambitious project, Apogee was instructed to perform a Utility Search…

Post Sections: